We have a project in list view. Sections from top to bottom are like
Blocked
In progress
Ready for engineering
When a new task is added to the project, it will not be add to a “no section” section on top (as it was in 2018), but rather to the topmost section by default, i.e. “blocked”.
For the project at hand, it would make more sense to assume that any task added to it is “Ready for engineering”, so I would like to have new tasks added to that section by default, rather than the topmost section.
Is that possible?