Kanban Board View - Primary and Secondary Groupings (e.g. Group by Task Status AND by Section)

My team want to be able to use the Kanban board view by having a primary and secondary grouping. The first grouping (the horizontal row at the top) would be by status and the second group (the vertical grouping on the left-hand side) would be by section. Each Section would have the ability to expand or collapse so they could see the status of the tasks only in a specific section. I’ve attached a low-level mock for your review.

4 Likes