Apply rules based on condition of task

Rules have two portions the trigger and the action. It would be great if rules also had criteria, conditions, or a filter to only run the action on specific tasks that meet the criteria. Such as if a specific email address is contained in the description.

2 posts were merged into an existing topic: Rules: Allow “Task Specific” Rules for projects