Is there a way to see multiple levels of subtasks in list view beyond the two or three available?
Task 1.0.0.0.0
Subtask 1.1.0.0.0
Subtask 1.1.1.0.0
Subtask 1.1.1.1.0
Subtask 1.1.1.1.1
Thanks
Andy
Is there a way to see multiple levels of subtasks in list view beyond the two or three available?
Task 1.0.0.0.0
Subtask 1.1.0.0.0
Subtask 1.1.1.0.0
Subtask 1.1.1.1.0
Subtask 1.1.1.1.1
Thanks
Andy
Hi Asana team, I am trying to do the same as Andy!