I have multiple teams working on a single project. Each team has an Asana section that manages their tasks. at a certain point, both teams will have combined tasks. I’d like to put those tasks in both sections.
There’s a mechanical engineering team (section 1) installing multiple physical machines (each with it’s own completion tasks), a computer engineering team(section 2) developing the overall and individual control systems (each with it’s own completion tasks). When both are done, they will work together to test and commission the new machine (these tasks need to be in both sections).
Is there a way to make this happen with Asana?