Schedule Baseline Fixes

Issue: Project Baseline is great but there is one glaring issue. If you make no changes to schedule for any length of time and you want to go back to find the last time there was a change to schedule you litterally have to go a click every single day until you find the day that there was a change in schedule.

Proposed Fix: Because there is a snapshot done everyday to the baseline the calendar you use to choose a date to set baseline should only show days where there was an actual change to the schedule, the days where there was no change should be greyed out and not selectable since there was no change and days you revised the schedule should show up. That way if there is long stretches of no changes (which is normal) you only have to check the days where something was done so you can go see what that change was.

3 Likes

@Adam_Rahmani,

Does the request you’re making really relate to Baseline functionality? I think your legitimate request is one thing, and Baseline is another–it’s way to see your current plan as it relates to the plan on an arbitrary date.

Would you consider suggesting another title for this request as a result?

Thanks,

Larry

I mean sure, it is related to baseline functionality. Currently it works but not in an ideal manner. I will revised the title.

1 Like