Hi @Handra2 , have a look at point 1. in this post:
The issue is that since you add a number to a date calculation, Asana converts the result into minutes. So the workaround is to simply divide your result by 1440 (minutes within a day)
Hi @Handra2 , have a look at point 1. in this post:
The issue is that since you add a number to a date calculation, Asana converts the result into minutes. So the workaround is to simply divide your result by 1440 (minutes within a day)