Datediff between date type field incorrectly calculated

Hi @Handra2 , have a look at point 1. in this post:

The issue is that since you add a number to a date calculation, Asana converts the result into minutes. So the workaround is to simply divide your result by 1440 (minutes within a day) :wink:

1 Like