Copying a section with due date's and dependency's

Hello everybody,

The template we use for our projects are build up by sections. These sections blocks all have tasks in it with predetermined due date’s and dependecy’s.

Is there a way to copy these section block with the due date’s en dependency’s? I could make like 20 section blocks in the template. But this is a lot of work and when the number of blocks exceeds 20 I have to do this manualy.

This picture shows the sections that I want to copy. This is just one of the 15 stages in the project that we use. That means if I want make the template complete, I have to do this 15x20 = 300 times :persevere:

Is there a tricks around this or a other solution?

Kind regards,

Duco Mast

A post was merged into an existing topic: Ability to copy sections including all tasks in that section