Asana2Go Adds New Projects Dashboard/Roll-Up Feature

I did find it on the Home page. It doesn’t look like I can do much except switch between list and tile view.

There are none, I was referring you 3rd party solutions. Have a look at The ultimate guide for doing things with Asana or contact me for a custom solution.

Asana2Go keeps asking me to login to Asana but I already am. I even logged out and back in, but it is still asking. Any advice?

Yes I can help (I’m the creator of Asana2Go). So as not to clutter up this board with Asana2Go support, I’ve private messaged you so we can take this offline.

Thanks,

Larry

I keep getting the same message, please log in to Asana first; even though I am logged in with my Google account (via SSO).

@anon92762732, I’ll PM you here to resolve, or feel free to contact me here for support: Contact Trilogi

Thanks,

Larry

Hi,
I just installed the promising Asana2go.
I get a “please sign in to asana first” message, but I’m already signed in to Asana.
I disconnected and reconnected Asana and it still doesn’t work with Asana2go.
Is it possible to help me please?

Thank you

I’ve just replied in a private message here to you, @Myriam_Baril-Boiscla.

Does percent complete , actually calculate the percent complete based on duration of tasks and time taken or just tasks completed/total tasks?

Welcome, @anon93776562,

Actually, that’s just an example of a custom field you’d manually set as you wish, but displayed as a meter in Asana2Go.

For auto calculation based on tasks completed, you can see this in Asana Business or Enterprise plans in the Portfolio or Goals features.

Thanks,

Larry

Hi Larry, Are you able to help me? I’m trying to figure out how to create a dashboard with status roll ups that show percent complete. I saw an image of Asana 2 Go extension being able to create this.

1 Like

image

Welcome, @Liz_Almonte,

I’ve direct messaged you here in the Forum (in order to keep Asana2Go support questions out of the general Asana Forum.

Thanks,

Larry

I would also be very much interested in the answer to Liz_Almonte’s question!

I also want to have a task progress based on effort points rather than number of tasks completed (if that was what was asked here). Can you help me out?

Welcome, @Uğur_Elçin_Tüfenk,

Have you watched the video and read the article at:

If you still have questions, please contact me offline at:
https://trilogisoftware.com/contact