Hi everyone,
I have set up several projects (boards) for our marketing team, one for each area, and assigned rules to them. Now I have noticed that some rules simply do not work, especially the one that says: When a task is added to the board and a tag is selected, the ticket should be added to another project. Here, for example, is the social media board with different fields to choose from, where I have created a country tag for Switzerland as a field. So if Switzerland is selected from the ‘Country’ field (1 of 4 options), the ticket should be added to the Switzerland board in the Open column. The board contains several country tags to choose from. Addtionalle the rule, automatically assigns tickets when a specific tag such as LinkedIn is selected to a person. Unfortunately, either no rule applies or only one of several. I have read that the order of the rules is important, but how do I know that? Unfortunately, this means that tickets currently have to be manually added to another project.
Thank you.