When the task is long by sending from email, I have to scroll down to select section which is next to project name
. This is a bad design.
3 posts were merged into an existing topic: UI change - Project tabs/buttons in tasks pushed down
When the task is long by sending from email, I have to scroll down to select section which is next to project name
. This is a bad design.
3 posts were merged into an existing topic: UI change - Project tabs/buttons in tasks pushed down