I hope I’m just missing something, but all my integration with Jira does is allow me to filter a single Project, and a single Issue type. Okay, but I don’t want EVERY SINGLE TICKET that’s open in the project to sync over.
Where/how do I filter (say using a JQL query from Jira) to better refine what Issues actually are synced?
My use case is that I only need one-way sync from Jira into Asana. There are certain Stories that I want to monitor their status from the Asana side. The Jira Issues are already created and I’m trying to figure out how to connect them (and future ones that meet a filterable criteria).