## [Creating an icon for BLOCKING tasks](https://forum.asana.com/t/creating-an-icon-for-blocking-tasks/1162546)

<div class="topic-metadata">

**Author:** [@Li\_Amerongen](https://forum.asana.com/u/Li_Amerongen)\
**Replies:** 3\
**Last updated:** [26 November 2026 16:21 UTC](https://forum.asana.com/t/creating-an-icon-for-blocking-tasks/1162546 "2026-11-26T16:21:50Z")

</div>

I love the hourglass icon on blocked tasks because it allows me to quickly see which tasks I can’t move forward with. It would be incredibly useful to have a corresponding icon indicating when I’m the blocker — when som…

---

## [Graph/map layout to see all dependency networks](https://forum.asana.com/t/graph-map-layout-to-see-all-dependency-networks/1161073)

<div class="topic-metadata">

**Author:** [@Danijel\_Žganec](https://forum.asana.com/u/Danijel_%C5%BDganec)\
**Replies:** 0\
**Last updated:** [7 November 2026 19:40 UTC](https://forum.asana.com/t/graph-map-layout-to-see-all-dependency-networks/1161073 "2026-11-07T19:40:07Z")

</div>

Hello. As the complexity of managing work increases, I have come to need a map/chain of all dependencies between tasks. The dependencies shown in the “Gantt” view or the “Timeline” view are useful when all tasks have a “…

---

## [Change default dependency direction?](https://forum.asana.com/t/change-default-dependency-direction/1160304)

<div class="topic-metadata">

**Author:** [@Liohn\_Sherer](https://forum.asana.com/u/Liohn_Sherer)\
**Replies:** 2\
**Last updated:** [3 November 2026 17:23 UTC](https://forum.asana.com/t/change-default-dependency-direction/1160304 "2026-11-03T17:23:21Z")

</div>

Is there a way to change the default dependency direction from “Blocked by” to “Blocking”, either per project or per user? We’re building a booking-management workflow for a client. Mark receives a booking request, open…

---

## [Auto calculate due date with duration & dependencies](https://forum.asana.com/t/auto-calculate-due-date-with-duration-dependencies/87055)

<div class="topic-metadata">

**Author:** [@anon54703358](https://forum.asana.com/u/anon54703358)\
**Replies:** 44\
**Last updated:** [23 October 2026 13:44 UTC](https://forum.asana.com/t/auto-calculate-due-date-with-duration-dependencies/87055 "2026-10-23T13:44:59Z")

</div>

I’m transitioning from Smartsheet and trying to replicate a feature I can’t work without. I have a Smartsheet template that auto calculates an approximate delivery date based on the start date; taking into account variou…

---

## [Messy representation of dependencies in Timeline or Gantt views](https://forum.asana.com/t/messy-representation-of-dependencies-in-timeline-or-gantt-views/852432)

<div class="topic-metadata">

**Author:** [@Shawn\_Taylor](https://forum.asana.com/u/Shawn_Taylor)\
**Replies:** 12\
**Last updated:** [13 October 2026 06:59 UTC](https://forum.asana.com/t/messy-representation-of-dependencies-in-timeline-or-gantt-views/852432 "2026-10-13T06:59:52Z")

</div>

In timeline and gantt views, how dependencies are represented gets really messy when the next task is due in the next one or two days. See my screenshot below. What if the arrow came out of the bottom of the prior task i…

---

## [Dependency Mapping](https://forum.asana.com/t/dependency-mapping/1156944)

<div class="topic-metadata">

**Author:** [@Bhumika\_Bihani](https://forum.asana.com/u/Bhumika_Bihani)\
**Replies:** 2\
**Last updated:** [5 October 2026 05:43 UTC](https://forum.asana.com/t/dependency-mapping/1156944 "2026-10-05T05:43:53Z")

</div>

Hi Team, I have created a generic project template for one of my clients, which is used whenever a new request is received. The request is converted into a project using this template, and the predefined tasks, dependen…

---

## [Ability to See Milestone Dependencies from Portfolio View](https://forum.asana.com/t/ability-to-see-milestone-dependencies-from-portfolio-view/1154811)

<div class="topic-metadata">

**Author:** [@deejloueej](https://forum.asana.com/u/deejloueej)\
**Replies:** 2\
**Last updated:** [9 September 2026 14:21 UTC](https://forum.asana.com/t/ability-to-see-milestone-dependencies-from-portfolio-view/1154811 "2026-09-09T14:21:11Z")

</div>

Our PMO is utilizing dependencies across projects to monitor project sequencing and resourcing. Right now, we are multi-homing milestones/tasks into a separate project to see and maintain the dependency relationships. Id…

---

## [Dependencies with Lags](https://forum.asana.com/t/dependencies-with-lags/1153817)

<div class="topic-metadata">

**Author:** [@Lara\_Beck](https://forum.asana.com/u/Lara_Beck)\
**Replies:** 4\
**Last updated:** [31 August 2026 12:22 UTC](https://forum.asana.com/t/dependencies-with-lags/1153817 "2026-08-31T12:22:36Z")

</div>

Hi, I tried to search a lot before posting this, but couldn’t find anything that matched exactly what I’m looking for. In MS project and other Gantt tools, it’s an industry standard to be able to set dependencies with …

---

## [Choosing default dependency management](https://forum.asana.com/t/choosing-default-dependency-management/760555)

<div class="topic-metadata">

**Author:** [@Brian\_Fewell](https://forum.asana.com/u/Brian_Fewell)\
**Replies:** 5\
**Last updated:** [21 August 2026 03:40 UTC](https://forum.asana.com/t/choosing-default-dependency-management/760555 "2026-08-21T03:40:55Z")

</div>

It would be nice to be able to change the default dependency management option organization-wide, or for teams, or other scales above each project. We want to use “maintain buffer” pretty much all the time & it would be …

---

## [Due dates in cross-project dependencies (including My Tasks) should be updated](https://forum.asana.com/t/due-dates-in-cross-project-dependencies-including-my-tasks-should-be-updated/705970)

<div class="topic-metadata">

**Author:** [@Stephen\_Li](https://forum.asana.com/u/Stephen_Li)\
**Replies:** 18\
**Last updated:** [5 August 2026 14:54 UTC](https://forum.asana.com/t/due-dates-in-cross-project-dependencies-including-my-tasks-should-be-updated/705970 "2026-08-05T14:54:14Z")

</div>

Hi all, TL;DR - Changes to due dates on tasks with dependencies across different projects should update due dates of dependent tasks in all projects (or pop out a modal asking user to approve date changes in other proje…

---

## [Getting Started with Asana Dependencies](https://forum.asana.com/t/getting-started-with-asana-dependencies/1150964)

<div class="topic-metadata">

**Author:** [@paulminors](https://forum.asana.com/u/paulminors)\
**Replies:** 0\
**Last updated:** [4 August 2026 21:49 UTC](https://forum.asana.com/t/getting-started-with-asana-dependencies/1150964 "2026-08-04T21:49:09Z")

</div>

Due dates on tasks are important, but it’s Dependencies that tell your team when a task is ready to be worked on. Set them up and you stop chasing people for updates and stop guessing what’s blocking what. If you build …

---

## [Excluding Blocked Tasks from Reports](https://forum.asana.com/t/excluding-blocked-tasks-from-reports/179261)

<div class="topic-metadata">

**Author:** [@anon61812162](https://forum.asana.com/u/anon61812162)\
**Replies:** 15\
**Last updated:** [27 July 2026 16:29 UTC](https://forum.asana.com/t/excluding-blocked-tasks-from-reports/179261 "2026-07-27T16:29:19Z")

</div>

Hey Everyone! So my company is just beginning to utilize reporting features. I have prepared a dashboard for management to track overdue tasks by department. The idea we have a different chart where overdue tasks are br…

---

## [Updating ALL the dependent tasks date, in every project](https://forum.asana.com/t/updating-all-the-dependent-tasks-date-in-every-project/1148432)

<div class="topic-metadata">

**Author:** [@FMF](https://forum.asana.com/u/FMF)\
**Replies:** 0\
**Last updated:** [15 July 2026 07:48 UTC](https://forum.asana.com/t/updating-all-the-dependent-tasks-date-in-every-project/1148432 "2026-07-15T07:48:45Z")

</div>

Hi, Here’s the scenario: a task is multihomed in two projects, and in each one it has different other tasks linked with dependencies. When the main task is rescheduled while looking at the project A, only the dependent…

---

## [Due-date dependencies on multi-homed task](https://forum.asana.com/t/due-date-dependencies-on-multi-homed-task/1148302)

<div class="topic-metadata">

**Author:** [@FMF](https://forum.asana.com/u/FMF)\
**Replies:** 1\
**Last updated:** [14 July 2026 13:43 UTC](https://forum.asana.com/t/due-date-dependencies-on-multi-homed-task/1148302 "2026-07-14T13:43:58Z")

</div>

Hi, I have a task that is multi-homed in two different projects, with two different sequences of tasks connected via dependencies. When i move the due date of the task, only the dependent tasks in the project i am work…

---

## [Relative dates for subtasks backward from parent task due date](https://forum.asana.com/t/relative-dates-for-subtasks-backward-from-parent-task-due-date/1147034)

<div class="topic-metadata">

**Author:** [@Lauren\_Knapp](https://forum.asana.com/u/Lauren_Knapp)\
**Replies:** 2\
**Last updated:** [6 July 2026 07:31 UTC](https://forum.asana.com/t/relative-dates-for-subtasks-backward-from-parent-task-due-date/1147034 "2026-07-06T07:31:35Z")

</div>

Hi - I’d like to create a Task Template with relative dates for subtasks that change based on the parent task due date. For example, subtask 1 is due 15 business days prior to the task due date and subtask 2 is due 13 …

---

## [Static Start and End Dates Not Effected by Dependency Date Shifting](https://forum.asana.com/t/static-start-and-end-dates-not-effected-by-dependency-date-shifting/1140506)

<div class="topic-metadata">

**Author:** [@Carly\_Rowaan](https://forum.asana.com/u/Carly_Rowaan)\
**Replies:** 6\
**Last updated:** [5 June 2026 11:08 UTC](https://forum.asana.com/t/static-start-and-end-dates-not-effected-by-dependency-date-shifting/1140506 "2026-06-05T11:08:25Z")

</div>

It would be incredibly helpful if there was an option to have a project start and end date remain unchanged by maintain buffer or consume buffer on dependent tasks. The projects I work through and manage have very firm …

---

## [Dependency Shifting from My Tasks](https://forum.asana.com/t/dependency-shifting-from-my-tasks/1141762)

<div class="topic-metadata">

**Author:** [@Zascha\_Fox](https://forum.asana.com/u/Zascha_Fox)\
**Replies:** 0\
**Last updated:** [20 May 2026 16:58 UTC](https://forum.asana.com/t/dependency-shifting-from-my-tasks/1141762 "2026-05-20T16:58:44Z")

</div>

Currently (if your dependency settings are set for this), if you change a due date for a task within a project, it affects the due dates of downstream dependencies. However, when I change a due date from “My Tasks”, no d…

---

## [Rules: Create tasks that have dependencies on the trigger task](https://forum.asana.com/t/rules-create-tasks-that-have-dependencies-on-the-trigger-task/1141419)

<div class="topic-metadata">

**Author:** [@anon78163419](https://forum.asana.com/u/anon78163419)\
**Replies:** 0\
**Last updated:** [18 May 2026 16:43 UTC](https://forum.asana.com/t/rules-create-tasks-that-have-dependencies-on-the-trigger-task/1141419 "2026-05-18T16:43:38Z")

</div>

I would like to set up this custom rule: When a task type is changed, Check if task type is “X” Create a task that is Blocked By the trigger task (has a dependency on the trigger task) A rule seems to do all of these …

---

## [Dependency label compiled incorrectly displaying text "Â·" instead of middle dot](https://forum.asana.com/t/dependency-label-compiled-incorrectly-displaying-text-a-instead-of-middle-dot/1139917)

<div class="topic-metadata">

**Author:** [@Skyler](https://forum.asana.com/u/Skyler)\
**Replies:** 3\
**Last updated:** [7 May 2026 20:23 UTC](https://forum.asana.com/t/dependency-label-compiled-incorrectly-displaying-text-a-instead-of-middle-dot/1139917 "2026-05-07T20:23:43Z")

</div>

Dependency type label render broken. Shows Â· instead of · between dependency type and abbreviation. CSS Reference: .TaskDependencyRenderHelpers-dependencyTypeSelectItemAbbreviation:before { content: "Â·"; } UT…

---

## [Date shift based off master task](https://forum.asana.com/t/date-shift-based-off-master-task/1138870)

<div class="topic-metadata">

**Author:** [@Jason\_Hutcherson1](https://forum.asana.com/u/Jason_Hutcherson1)\
**Replies:** 1\
**Last updated:** [1 May 2026 19:04 UTC](https://forum.asana.com/t/date-shift-based-off-master-task/1138870 "2026-05-01T19:04:56Z")

</div>

Hi all, I’m working on setting up a recurring template for my new job. Use case is repetitive build outs of locations with the same tasks and timelines every time. I know this setup works because I did it before at a pa…

---

## [Bring back the previous approval subtask behavior in rules](https://forum.asana.com/t/bring-back-the-previous-approval-subtask-behavior-in-rules/1116866)

<div class="topic-metadata">

**Author:** [@Thaïssa\_iDO](https://forum.asana.com/u/Tha%C3%AFssa_iDO)\
**Replies:** 7\
**Last updated:** [27 January 2026 04:33 UTC](https://forum.asana.com/t/bring-back-the-previous-approval-subtask-behavior-in-rules/1116866 "2026-01-27T04:33:32Z")

</div>

Hi, I’d like to share feedback on a recent change regarding approval subtasks created via rules. Previously, it was possible to create approval subtasks using the “Create subtask” action, which allowed them to: Exis…

---

## [Making one project dependent on another project](https://forum.asana.com/t/making-one-project-dependent-on-another-project/84168)

<div class="topic-metadata">

**Author:** [@Tanya\_Frankel-Waxman](https://forum.asana.com/u/Tanya_Frankel-Waxman)\
**Replies:** 17\
**Last updated:** [18 January 2026 10:43 UTC](https://forum.asana.com/t/making-one-project-dependent-on-another-project/84168 "2026-01-18T10:43:08Z")

</div>

It would make a lot of sense to enable dependencies between projects, in the same way we can make to tasks dependencies.

---

## [Dependency type (FS / FF / SS / SF) should be provided by the API](https://forum.asana.com/t/dependency-type-fs-ff-ss-sf-should-be-provided-by-the-api/1081087)

<div class="topic-metadata">

**Author:** [@Erik\_Labadie](https://forum.asana.com/u/Erik_Labadie)\
**Replies:** 5\
**Last updated:** [16 January 2026 01:10 UTC](https://forum.asana.com/t/dependency-type-fs-ff-ss-sf-should-be-provided-by-the-api/1081087 "2026-01-16T01:10:14Z")

</div>

Hi, the type of a dependency (FinishToFinish, FinishToStart, …) is one of the fundamentals of project management. It is considered by Asana (even with great automatic date shifting!) but not by its API. Knowing only ab…

---

## [Dependency relationship types (FS / SS / FF / SF) are not exposed via Asana API, limiting automation use cases and disrupting the normal dependency use case.](https://forum.asana.com/t/dependency-relationship-types-fs-ss-ff-sf-are-not-exposed-via-asana-api-limiting-automation-use-cases-and-disrupting-the-normal-dependency-use-case/1118522)

<div class="topic-metadata">

**Author:** [@anon88244334](https://forum.asana.com/u/anon88244334)\
**Replies:** 0\
**Last updated:** [15 January 2026 08:12 UTC](https://forum.asana.com/t/dependency-relationship-types-fs-ss-ff-sf-are-not-exposed-via-asana-api-limiting-automation-use-cases-and-disrupting-the-normal-dependency-use-case/1118522 "2026-01-15T08:12:30Z")

</div>

Hello Asana Community, I wanted to raise a general observation regarding task dependency relationships and automation in Asana. While Asana supports dependencies between tasks, the specific dependency relationship type…

---

## [Manual dependency addition - Default to select from subtasks in current view](https://forum.asana.com/t/manual-dependency-addition-default-to-select-from-subtasks-in-current-view/386064)

<div class="topic-metadata">

**Author:** [@anon84051081](https://forum.asana.com/u/anon84051081)\
**Replies:** 3\
**Last updated:** [5 January 2026 20:13 UTC](https://forum.asana.com/t/manual-dependency-addition-default-to-select-from-subtasks-in-current-view/386064 "2026-01-05T20:13:54Z")

</div>

A lot of projects created by my team reference areas of our facility that follow strict naming conventions. As such, we have multiple projects with identically named subtasks. When typing in the name of an area to manual…

---

## [Option to shift upstream dependencies](https://forum.asana.com/t/option-to-shift-upstream-dependencies/1044376)

<div class="topic-metadata">

**Author:** [@Stephen\_Li](https://forum.asana.com/u/Stephen_Li)\
**Replies:** 20\
**Last updated:** [19 December 2025 04:46 UTC](https://forum.asana.com/t/option-to-shift-upstream-dependencies/1044376 "2025-12-19T04:46:10Z")

</div>

With the recent update to dependency auto-shifting, with maintain buffer selected, you can only auto-shift dates downstream from a task. For example, if you have a chain A → B → C, if you shift the date of either B or C,…

---

## [依存関係（先行タスク、後行タスク）をルールに追加してほしい](https://forum.asana.com/t/topic/164616)

<div class="topic-metadata">

**Author:** [@anon72552084](https://forum.asana.com/u/anon72552084)\
**Replies:** 2\
**Last updated:** [2 December 2025 15:23 UTC](https://forum.asana.com/t/topic/164616 "2025-12-02T15:23:10Z")

</div>

依存関係（先行タスク・後行タスク）をルールに追加していただきたいです。 依存関係をトリガーやアクションとして利用できれば、多様な使い方ができると考えています。 恐れ入りますが、ご検討をよろしくお願いいたします

---

## ["Deactivating" project dependencies on one single task instead of the entire project](https://forum.asana.com/t/deactivating-project-dependencies-on-one-single-task-instead-of-the-entire-project/1067875)

<div class="topic-metadata">

**Author:** [@Jose\_Mejia1](https://forum.asana.com/u/Jose_Mejia1)\
**Replies:** 4\
**Last updated:** [13 November 2025 23:47 UTC](https://forum.asana.com/t/deactivating-project-dependencies-on-one-single-task-instead-of-the-entire-project/1067875 "2025-11-13T23:47:13Z")

</div>

I love all of the new changes to the shifting due dates feature however I wish I could deactivate the “auto-shift feature” on just one task at a time. For example if I have one particular task I want to shift without mov…

---

## [Dependency Types - Shifting?](https://forum.asana.com/t/dependency-types-shifting/1107285)

<div class="topic-metadata">

**Author:** [@Beth\_Seeber](https://forum.asana.com/u/Beth_Seeber)\
**Replies:** 5\
**Last updated:** [6 November 2025 19:08 UTC](https://forum.asana.com/t/dependency-types-shifting/1107285 "2025-11-06T19:08:10Z")

</div>

I’m looking into Dependency shifts using the various dependency types to assist in keeping times buffered. Currently if I have a task (Task C) that is dependent on multiple other tasks completion (Tasks A and B), if I sh…

---

## [Rules-induced rescheduling and depencencies](https://forum.asana.com/t/rules-induced-rescheduling-and-depencencies/1107451)

<div class="topic-metadata">

**Author:** [@FMF](https://forum.asana.com/u/FMF)\
**Replies:** 0\
**Last updated:** [6 November 2025 14:26 UTC](https://forum.asana.com/t/rules-induced-rescheduling-and-depencencies/1107451 "2025-11-06T14:26:48Z")

</div>

Hi, i’m trying to automate the due dates scheduling of a project with dependencies and rules. In particular, i’m trying to set the due date as the date in which the task is completed (via Rules, and it works so far), t…