# Tasks Created Via Email Needs Due Date

**URL:** <https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788>\
**Category:** Product Ideas\
**Created:** [14 March 2017 03:03 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788 "2017-03-14T03:03:23Z")\
**Posts on this page:** 15\
**Page:** 4

<div class="post-metadata">

**Author:** ![Steven\_Pearson](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/steven_pearson/32/82219_2.png) [@Steven\_Pearson](https://forum.asana.com/u/Steven_Pearson)\
**Post date:** [27 July 2021 18:45 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/61 "2021-07-27T18:45:15Z")

</div>

This would be so helpful to have! Are there any updates on when this feature might be available?

---

<div class="post-metadata">

**Author:** ![Stacie\_Simpson](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/stacie_simpson/32/65185_2.png) [@Stacie\_Simpson](https://forum.asana.com/u/Stacie_Simpson)\
**Post date:** [16 September 2021 16:38 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/62 "2021-09-16T16:38:33Z")

</div>

I think I finally found a workaround that works for me within Asana! And it’s basically mostly automated! Woohoo!!

I created a project called “Tasks Received from Email Inbox” and used the guide instructions to grab the project ID and set up an email contact to forward all email → task directly to that project. Then, I set up a Rule in that project that each new task needs to due date set to 0 days, assign the task to me, and set the custom field “status” to “needs review”. It shows up in the project, but (most importantly) it shows up in my My Tasks as due today. The “Needs Review” custom field (which I set to red) gives me a quick reference that I need to manually assign the task to the project it truly belongs in and/or adjust the due date. That’s maximum two manual steps, but at least I won’t be losing track of them any more!

\*\*Note: I am a solopreneur, so sorry if this doesn’t work for larger teams. I know there were some examples above.

 ![Screen Shot 2021-09-16 at 12.33.12 PM](https://us1.discourse-cdn.com/asana/original/3X/1/2/12c552d46ec5538a835d8d928b953d4c5d9f579f.jpeg)

---

<div class="post-metadata">

**Author:** ![David\_Jsa](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/david_jsa/32/79030_2.png) [@David\_Jsa](https://forum.asana.com/u/David_Jsa)\
**Post date:** [29 January 2022 00:47 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/63 "2022-01-29T00:47:34Z")

</div>

+1 I email myself tasks almost every day and this would be revolutionary.

If you want to be extra amazing, you could make it Smart Add like how RTM does it: [Remember The Milk - Help › How do I use Smart Add?](https://www.rememberthemilk.com/help/?ctx=basics.smartadd.howdoiuse)

Don’t have to incorporate everything, even just the Due Date adding would be enough but PLEEEEASE… pretty please?

---

<div class="post-metadata">

**Author:** ![Jeanette\_McCulloch](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/jeanette_mcculloch/32/5768_2.png) [@Jeanette\_McCulloch](https://forum.asana.com/u/Jeanette_McCulloch)\
**Post date:** [22 August 2022 01:56 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/66 "2022-08-22T01:56:51Z")

</div>

This is a great idea! Can you execute this solution on a premium account, or do you need a business account?

---

<div class="post-metadata">

**Author:** ![Christopher\_Zook](https://luna1.co/8d76cd.png) [@Christopher\_Zook](https://forum.asana.com/u/Christopher_Zook)\
**Post date:** [11 February 2023 22:20 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/67 "2023-02-11T22:20:44Z")

</div>

What is the status on this requested feature? it has been in the queue for years and I know it would be massively valuable to everyone to be able to assign a date without having to take multiple steps. thx!

---

<div class="post-metadata">

**Author:** ![teela](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/teela/32/129544_2.png) [@teela](https://forum.asana.com/u/teela)\
**Post date:** [25 April 2023 22:43 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/68 "2023-04-25T22:43:59Z")

</div>

Thank for this awesome work around!!

---

<div class="post-metadata">

**Author:** ![Brian\_Fewell](https://luna1.co/8d76cd.png) [@Brian\_Fewell](https://forum.asana.com/u/Brian_Fewell)\
**Post date:** [8 May 2024 14:22 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/69 "2024-05-08T14:22:44Z")

</div>

This would be a great addition — something simple like a trigger operator or keyword in the subject line to create a due date would make this feature 200% better. Really hope it makes it into a future update!

(I say “simple” but I’m not a programmer so… 🤷)

---

<div class="post-metadata">

**Author:** ![Larry\_Berger\_lpb](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/larry_berger_lpb/32/276017_2.png) [@Larry\_Berger\_lpb](https://forum.asana.com/u/Larry_Berger_lpb)\
**Post date:** [8 May 2024 17:57 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/70 "2024-05-08T17:57:11Z")

</div>

_ **Note: Not a solution but marked as such to elevate a key reply** _

Just highlighting this earlier post in this very long thread which offers a workaround until/if this feature is added:

> [@Tasks Created Via Email Needs Due Date](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/49):
>
> FYI [Flowsana’s](https://flowsana.net) new hashtag automation feature lets you easily set the due date when emailing a task into Asana, just by including the due date anywhere in the email body with a hashtag. You can specify the date in a wide variety of ways: in addition to typing a date in a format like #12/28 or #June 15, you can also type a natural-language phrase for the date, like #tomorrow, #next Wed, #in 2 weeks, etc. Flowsana generally recognizes date phrases in the following languages: English Spanish Fr…

Thanks,

Larry

---

<div class="post-metadata">

**Author:** ![Carlos10](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/carlos10/32/198142_2.png) [@Carlos10](https://forum.asana.com/u/Carlos10)\
**Post date:** [14 May 2024 12:38 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/71 "2024-05-14T12:38:52Z")

</div>

Now this is helpful Thanks!

---

<div class="post-metadata">

**Author:** ![mortimermouse](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/mortimermouse/32/63222_2.png) [@mortimermouse](https://forum.asana.com/u/mortimermouse)\
**Post date:** [19 May 2025 20:24 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/72 "2025-05-19T20:24:35Z")

</div>

Hi Asana Team,

I’d like to request a feature that I found incredibly useful when using Teamwork for task management. Specifically, the ability to set start and due dates when creating tasks via email.

In Teamwork, you can include date directives within square brackets in the subject line to automatically assign start and due dates to the task. For example:

- `[today]` – sets today as the due date
- `[next week]` – sets a due date one week from today
- `[friday]` – sets the due date for the upcoming Friday
- `[22/03/2025]` – sets the specific due date

Additionally, you can define both a start and a due date by including two date directives, where the earliest date becomes the start date and the latest date becomes the due date:

- `[today][next monday]` – task starts today and is due next Monday
- `[16/12/2025][22/12/2025]` – task starts on Dec 16th and is due Dec 22nd

This simple syntax made it easy to manage deadlines directly from my inbox without needing to adjust dates after the task was created. Adding this functionality to Asana would be a game changer for those of us who rely on email-to-task workflows and need more flexibility in managing task timelines.

Thank you for considering this feature request. I appreciate all the work you’re doing to keep Asana powerful and user-friendly.

---

<div class="post-metadata">

**Author:** ![Herve\_Buisset](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/herve_buisset/32/287327_2.png) [@Herve\_Buisset](https://forum.asana.com/u/Herve_Buisset)\
**Post date:** [19 May 2025 20:56 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/73 "2025-05-19T20:56:54Z")

</div>

I think you can do this with Flowsana @Phil_Seeman

---

<div class="post-metadata">

**Author:** ![Phil\_Seeman](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/phil_seeman/32/81525_2.png) [@Phil\_Seeman](https://forum.asana.com/u/Phil_Seeman)\
**Post date:** [19 May 2025 23:40 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/74 "2025-05-19T23:40:17Z")

</div>

Hi @mortimermouse,

FYI I’ve moved your post to an existing thread for this request - you can vote for it at the top of the thread.

And yes, also, @Herve_Buisset is correct - unless/until Asana implements this feature, you can do it now via our Flowsana integration [as mentioned above.](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/49)

---

<div class="post-metadata">

**Author:** ![Bec1](https://luna1.co/8d76cd.png) [@Bec1](https://forum.asana.com/u/Bec1)\
**Post date:** [14 February 2026 04:28 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/75 "2026-02-14T04:28:59Z")

</div>

This feature would save me so much time.

---

<div class="post-metadata">

**Author:** ![JoelCharles](https://luna1.co/8d76cd.png) [@JoelCharles](https://forum.asana.com/u/JoelCharles)\
**Post date:** [23 June 2026 17:45 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/76 "2026-06-23T17:45:36Z")

</div>

Glad to see this is in the pipeline… though 2017 to now (2026) seems like quite a long pipeline.

---

<div class="post-metadata">

**Author:** ![Phil\_Seeman](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/phil_seeman/32/81525_2.png) [@Phil\_Seeman](https://forum.asana.com/u/Phil_Seeman)\
**Post date:** [23 June 2026 21:18 UTC](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788/77 "2026-06-23T21:18:59Z")

</div>

Hi @JoelCharles and welcome to the forum,

Pease note that post was a reference to it being in the pipeline for the Asana integration Sendana which no longer exists - not in the pipeline for Asana itself.

[Previous page](https://forum.asana.com/t/tasks-created-via-email-needs-due-date/788.md?page=3)
