Task to subtask

Is there a way to change a task level from task to subtask easily without having to delete and recreate?
I have a bunch of tasks at the wrong level and want to move them where I need them but cant seem to figure it out. I looked at some videos but haven’t found one covering this topic.

2 posts were merged into an existing topic: Make it possible to move multiple tasks as subtasks

Hi @anon90716345,

I merged your post with an existing thread asking for this capability. (You can add your vote at the top of that thread!)