Subtasks Always Part of Parent Project

I really think if you make all subtasks part of its parent project (without actually adding them to the tasklist), that would solve a lot of current issues that are going on with the Timeline, Calendar, and even Boards. The subtasks should always reflect the project their parent belongs to, and you can probably come up with another function to determine if the subtask actually shows up in the task list with the parent projects. You can call it “show at parent level” or just “parent level view” something like that.

But for the most part, I would think most of us don’t want to see the subtasks at the parent level, but we do want to see them show up on timelines, calendars, and maybe even boards, though I could see the board requiring some kind of action, like a “show subtasks” or toggle, or something.

2 posts were merged into an existing topic: Allow to automatically add subtasks to project

A vote has been moved.