Show subtasks of subtasks in List view

I love the drill-down triangle to see my subtasks. But I often create subtasks of those subtasks. Could you allow the drilldown at a second level on the list view?

It’ll save extra clicks from having to open a task and then the subtasks.

2 posts were merged into an existing topic: Ability to work on all levels of subtask from List view