At one point in time I believe I deleted the built-in priority sections (Recently Assigned, Today, Upcoming, Later). If it’s not possible to delete them, then I somehow hid them. I would like to get them back if possible.
Is someone able to assist?
At one point in time I believe I deleted the built-in priority sections (Recently Assigned, Today, Upcoming, Later). If it’s not possible to delete them, then I somehow hid them. I would like to get them back if possible.
Is someone able to assist?
Welcome, @Paden_Rourk,
You must have one section in My Tasks at least, because you can’t delete (though you can rename) the one used for the Recently Assigned function by Asana.
I think my article provides you with a really quick step-by-step to create these basic sections (besides the above):
Hope that helps,
Larry
This topic was automatically closed after 6 days. New replies are no longer allowed.