New Calendar View - Height Issue

With today’s new Calendar view, I can now only see three weeks (before I could see 5-6 weeks generally). Looks like the new calendar view was made to show four items. The minimum height of each day is now ~ 200 pixels high, even if the most items in a single day (within a week) are only two items. This leaves a ton of whitespace and makes the calendar less effective.

For weeks when the most tasks on a single day are one/two/threes items, can you make the row height collapse down to show more weeks?

A post was merged into an existing topic: New calendar view and how do I change it back?