Keep Layout as Default on Project Level

I want to keep the team level on calendar with weekends when I click on it; just like we can save layout views on project levels. How do I save it on the team level? The drop down is different for some reason.

Thanks!
E

2 posts were merged into an existing topic: Show weekend as default view in the Calendar