# How to set incomplete tasks filter to default

**URL:** <https://forum.asana.com/t/how-to-set-incomplete-tasks-filter-to-default/692829>\
**Category:** Ask the Community\
**Created:** [5 February 2024 19:58 UTC](https://forum.asana.com/t/how-to-set-incomplete-tasks-filter-to-default/692829 "2024-02-05T19:58:54Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![Erica\_Blair1](https://luna1.co/8d76cd.png) [@Erica\_Blair1](https://forum.asana.com/u/Erica_Blair1)\
**Post date:** [5 February 2024 19:58 UTC](https://forum.asana.com/t/how-to-set-incomplete-tasks-filter-to-default/692829/1 "2024-02-05T19:58:54Z")

</div>

Hi, I’ve found a few posts about this from the past - how to set incomplete tasks only to be the default view of a project. However all the links that were provided about how to set this up are no longer active or don’t contain that information. What is the most recent way to set this setting?

---

<div class="post-metadata">

**Author:** ![anon91170507](https://luna1.co/8d76cd.png) [@anon91170507](https://forum.asana.com/u/anon91170507)\
**Post date:** [5 February 2024 20:18 UTC](https://forum.asana.com/t/how-to-set-incomplete-tasks-filter-to-default/692829/2 "2024-02-05T20:18:34Z")

</div>

In a project, like this:

 ![image](https://us1.discourse-cdn.com/asana/original/3X/c/d/cd058ee267d16ae0fbc93d600b0c31f2149a33c4.png)

Please note that the **Save view** control only appears when you have saveable changes.

In My Tasks, it appears that filters are sticky, with no need to save.

---

<div class="post-metadata">

**Author:** ![system](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/system/32/276370_2.png) [@system](https://forum.asana.com/u/system)\
**Post date:** [12 February 2024 20:19 UTC](https://forum.asana.com/t/how-to-set-incomplete-tasks-filter-to-default/692829/3 "2024-02-12T20:19:22Z")

</div>

Closed on 12 February 2024 20:19 UTC

This topic was automatically closed 7 days after the last reply. New replies are no longer allowed.
