# How does Asana determine which project fields are included in the email notification?

**URL:** <https://forum.asana.com/t/how-does-asana-determine-which-project-fields-are-included-in-the-email-notification/1145780>\
**Category:** Ask the Community\
**Tags:** emails, notifications, agentic-work-management\
**Created:** [23 June 2026 02:34 UTC](https://forum.asana.com/t/how-does-asana-determine-which-project-fields-are-included-in-the-email-notification/1145780 "2026-06-23T02:34:11Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![Kennedy808](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/kennedy808/32/290265_2.png) [@Kennedy808](https://forum.asana.com/u/Kennedy808)\
**Post date:** [23 June 2026 02:34 UTC](https://forum.asana.com/t/how-does-asana-determine-which-project-fields-are-included-in-the-email-notification/1145780/1 "2026-06-23T02:34:11Z")

</div>

We’re using subtasks on a main task for an approval flow and assigning each approver when the previous dependency is lifted.

The “you’ve been assigned a task” email notification has many of the fields from the project, but not all of them.

It also seems to change the items included from email to email.

Is there any way to control which ones appear in the notification email?

---

<div class="post-metadata">

**Author:** ![Irish\_Makimura](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/irish_makimura/32/288760_2.png) [@Irish\_Makimura](https://forum.asana.com/u/Irish_Makimura)\
**Post date:** [25 June 2026 02:33 UTC](https://forum.asana.com/t/how-does-asana-determine-which-project-fields-are-included-in-the-email-notification/1145780/2 "2026-06-25T02:33:50Z")

</div>

Hi @Kennedy808 🤩 , welcome to the community!

There isn’t currently a way to control which fields appear in Asana’s assignment notification emails.

The information included is generated automatically by Asana and can vary depending on the task and notification type. If certain details are critical for approvers, consider including them in the task title or description for greater visibility.

If this level of customization would be valuable for your workflow, I’d also encourage you to submit it as a [product feedback request](https://forum.asana.com/c/forum-en/product-feedback/20)in the Forum so the product team can consider it for future enhancements. 😊

---

<div class="post-metadata">

**Author:** ![system](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/system/32/276370_2.png) [@system](https://forum.asana.com/u/system)\
**Post date:** [25 July 2026 02:34 UTC](https://forum.asana.com/t/how-does-asana-determine-which-project-fields-are-included-in-the-email-notification/1145780/3 "2026-07-25T02:34:25Z")

</div>

Closed on 25 July 2026 02:34 UTC

This topic was automatically closed 30 days after the last reply. New replies are no longer allowed.
