How do I assign the tasks in a project to multiple staff at the same time?

I created an Asana Adoption Project. Each of my four direct reports now needs to complete each of the 20 or so tasks in this Project. How do I assign all 20 tasks to each of my direct reports at the same time?

Hi @Michael_Sorcinelli :slight_smile:

When you click on a single task, you can choose multiple assignees (which creates a copy of the task for each person):

17%20PM

Amy

3 Likes

Also note that multiple assignees (as 1 task - multiple assignees) is against Asana’s vision because of the accountability issues :slight_smile: that’s why you can’t assign a single task to multiple people.

1 Like

thanks Amy!!!