# Google Calendar Integration with due times

**URL:** <https://forum.asana.com/t/google-calendar-integration-with-due-times/123628>\
**Category:** Made by Asana Apps\
**Tags:** google-calendar\
**Created:** [1 June 2021 18:29 UTC](https://forum.asana.com/t/google-calendar-integration-with-due-times/123628 "2021-06-01T18:29:54Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![Katie\_Tanner](https://luna1.co/8d76cd.png) [@Katie\_Tanner](https://forum.asana.com/u/Katie_Tanner)\
**Post date:** [1 June 2021 18:29 UTC](https://forum.asana.com/t/google-calendar-integration-with-due-times/123628/1 "2021-06-01T18:29:54Z")

</div>

I know there is a way to sync your Asana tasks to your google calendar. I love having all of my meetings and tasks in the same place! I have several tasks that I need to assign times to (which I know how to do in Asana) but when they sync with my Google Calendar, they just appear as tasks at the top of my day and don’t have times assigned to them. Is there a good work around for this?

Thank you!

---

<div class="post-metadata">

**Author:** ![Bastien\_Siebman](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/bastien_siebman/32/172354_2.png) [@Bastien\_Siebman](https://forum.asana.com/u/Bastien_Siebman)\
**Post date:** [1 June 2021 19:41 UTC](https://forum.asana.com/t/google-calendar-integration-with-due-times/123628/2 "2021-06-01T19:41:18Z")

</div>

Hi,

This is a known limitation, there is a big thread on the topic on the forum, you should be able to find it easily using the search 👍

---

<div class="post-metadata">

**Author:** ![system](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/system/32/276370_2.png) [@system](https://forum.asana.com/u/system)\
**Post date:** [30 May 2025 19:05 UTC](https://forum.asana.com/t/google-calendar-integration-with-due-times/123628/3 "2025-05-30T19:05:36Z")

</div>

Closed on 30 May 2025 19:05 UTC


