I’m trying to improve the efficiency of scheduled automations that run against multi-homed tasks.
I currently have tasks that are multi-homed into several projects. The same automation logic runs against these tasks in each project. To avoid a race condition I have staggered the scheduled start time of each automation. This works but is inefficient as each automation run re-inspects the multi-homed task set.
My suggestion is to expand the new pre-automation filtering capability to allow task filtering by project inclusion (e.g. this project(s) only) that would reduce/eliminate the wasted task inspection. For me, it would eliminate much redundancy / waste.