Color coating date-range due dates

Currently Asana only changes the color of a date ranges (as red) once the end date has past. Also when ordering tasks by due date, these ranges are placed at the end of the list via the end date rather than the start date.

My recommendation is to color coat these date ranged due dates a tertiary color (maybe yellow) once the start date is passed and placing these in order using the start date rather than the end date.

Reason being, my eyes follow the list downwards and if I have a task with a range of Dec 4th - 7th but it shows at the end of the list (and without a color differentiation), I might as well should have opted for a due date on the 7th rather than a range.

3 posts were merged into an existing topic: Control Due Date colors

2 votes have been moved.