Automatic due dates based on final date

One of our commonly used task templates has a long list (20-30+) of subtasks attached to it, with corresponding due dates based on specific amounts of time prior to the “final” due date.

For example, when we hold a “101” class on May 1, there are certain tasks leading up to the class date the day before, a week prior, three weeks prior, etc. We hold these “101” classes, among others, multiple times per month, and I lose a lot of time manually assigning due dates to the tasks leading up to it every time we schedule a course.

A feature that would make my life much easier would be if we could pre-set those due date ‘intervals’ in a template so that once the top-level task’s due date is assigned, the rest of those lead-up tasks would automatically have their dates assigned.