# Automate goal progress by tasks from specific project sections

**URL:** <https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347>\
**Category:** Ask the Community\
**Tags:** goals\
**Created:** [23 January 2025 13:37 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347 "2025-01-23T13:37:17Z")\
**Posts on this page:** 7\
**Page:** 1

<div class="post-metadata">

**Author:** ![Sami\_Gatesman](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/sami_gatesman/32/97817_2.png) [@Sami\_Gatesman](https://forum.asana.com/u/Sami_Gatesman)\
**Post date:** [23 January 2025 13:37 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347/1 "2025-01-23T13:37:17Z")

</div>

We need the ability to select sections within a project to update goal progress. Currently, each individual task must be connected to the goal in order to update the goal progress.

The current process assumes that single tasks or entire projects are connected to one subgoal. That doesn’t work for everything. Not every subgoal has an entire project. Some subgoals are smaller pieces of a larger goal and a few subgoals may be contained in a single project. It would be extremely helpful to select a section in one project to update a subgoal.

A [previous suggestion](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-sections/177568/1) was closed prematurely.

---

<div class="post-metadata">

**Author:** ![Larry\_Berger\_lpb](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/larry_berger_lpb/32/276017_2.png) [@Larry\_Berger\_lpb](https://forum.asana.com/u/Larry_Berger_lpb)\
**Post date:** [23 January 2025 13:50 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347/2 "2025-01-23T13:50:49Z")

</div>

_ **Note: Not a solution but marked as such to elevate a key reply** _

@Sami_Gatesman, I agree with you that it would be helpful, and in case you missed it, I provided a workaround that you can use now:

> [@Automate goal progress by tasks from specific sections](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-sections/177568/4):
>
> Until/if Asana offers this, you could use multi-homing (and rules to automate that multi-homing if on Business/Enterprise) to add all of a section’s tasks and milestones to another project and then instead make that project the reference for the goal (not the original project), @Joel_Lee, that could work for both of your feature requests, possibly. Larry

Also, another option (or could be used in combination) that could help is Automatic progress calculation by Milestones instead of tasks. I almost always prefer that option vs the tasks option.

@Emily_Roman, Would you consider reopening the topic @Sami_Gatesman linked to above? I think it would be good to do that because the feature launched didn’t actually address the request, and merge this topic into that one once re-opened.

Thanks,

Larry

---

<div class="post-metadata">

**Author:** ![Sami\_Gatesman](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/sami_gatesman/32/97817_2.png) [@Sami\_Gatesman](https://forum.asana.com/u/Sami_Gatesman)\
**Post date:** [28 January 2025 13:36 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347/3 "2025-01-28T13:36:22Z")

</div>

Larry- thank you for your response! I also submitted a ticket on that old post and am hoping the Asana team will review and reopen it because, like you said, the original request was not necessarily satisfied.

---

<div class="post-metadata">

**Author:** ![Larry\_Berger\_lpb](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/larry_berger_lpb/32/276017_2.png) [@Larry\_Berger\_lpb](https://forum.asana.com/u/Larry_Berger_lpb)\
**Post date:** [28 January 2025 14:18 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347/4 "2025-01-28T14:18:09Z")

</div>

> [@Sami\_Gatesman](#):
>
> I also submitted a ticket on that old post and am hoping the Asana team will review and reopen it because, like you said, the original request was not necessarily satisfied.

[@Forum-team](https://forum.asana.com/groups/forum-team), would you consider reopening the following topic, for the reasons above and previously in this thread?

> [@Automate goal progress by tasks from specific sections](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-sections/177568):
>
> I love the new automated goal progress feature. It has been hugely helpful. However, the only two methods of configuration for tracking goal progress is by tasks completed and milestones completed, within specific projects. Feature Request(s): Being able to hook up specific sections to a goal would be a game-changer. The current process assumes that the entire project would relate to the goal, but in reality, people often house multiple tasks that may contribute to different goals, and so bei…

Thanks,

Larry

---

<div class="post-metadata">

**Author:** ![Emily\_Roman](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/emily_roman/32/283076_2.png) [@Emily\_Roman](https://forum.asana.com/u/Emily_Roman)\
**Post date:** [29 January 2025 11:38 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347/5 "2025-01-29T11:38:47Z")

</div>

Hi @Larry_Berger_lpb and @Sami_Gatesman, thanks for flagging this! I agree and I just reopened the thread 🙂 We will comment on the thread if we implement the option to track goal progress from tasks from specific sections instead of all tasks.

---

<div class="post-metadata">

**Author:** ![Sami\_Gatesman](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/sami_gatesman/32/97817_2.png) [@Sami\_Gatesman](https://forum.asana.com/u/Sami_Gatesman)\
**Post date:** [29 January 2025 13:09 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347/6 "2025-01-29T13:09:18Z")

</div>

@Emily_Roman, thank you for reviewing and reopening the thread! I hope the team is able to make that update happen. It would be a huge help at my organization.

---

<div class="post-metadata">

**Author:** ![system](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/system/32/276370_2.png) [@system](https://forum.asana.com/u/system)\
**Post date:** [5 February 2025 13:09 UTC](https://forum.asana.com/t/automate-goal-progress-by-tasks-from-specific-project-sections/1017347/7 "2025-02-05T13:09:46Z")

</div>

Closed on 5 February 2025 13:09 UTC

This topic was automatically closed 7 days after the last reply. New replies are no longer allowed.