# ability to set a condition in rules: Check If task is in project

**URL:** <https://forum.asana.com/t/ability-to-set-a-condition-in-rules-check-if-task-is-in-project/794680>\
**Category:** Features Launched\
**Tags:** productivity, launched\
**Created:** [3 May 2024 20:41 UTC](https://forum.asana.com/t/ability-to-set-a-condition-in-rules-check-if-task-is-in-project/794680 "2024-05-03T20:41:51Z")\
**Posts on this page:** 1\
**Showing post:** 29

<div class="post-metadata">

**Author:** ![Stephen\_Li](https://sea2.discourse-cdn.com/asana/user_avatar/forum.asana.com/stephen_li/32/279555_2.png) [@Stephen\_Li](https://forum.asana.com/u/Stephen_Li)\
**Post date:** [2 March 2024 06:01 UTC](https://forum.asana.com/t/ability-to-set-a-condition-in-rules-check-if-task-is-in-project/794680/29 "2024-03-02T06:01:14Z")

</div>

Hi @SPurz ,

Depending on the scope/scale (i.e. how many target projects are there; how many originating projects are there; are there variations in process across these permutations), perhaps you could consider creating a “Added to other project” field (single-select, one option: ✅) that gets set when the rule runs. Then, also include a condition in the rule that checks if that field is set to ✅ already.

---

_[View the full topic](https://forum.asana.com/t/ability-to-set-a-condition-in-rules-check-if-task-is-in-project/794680)._
